De-watering pump primed for big projects
|
A new cost-effective 6 inch diesel self priming centrifugal pump - capable of moving huge quantities of water - has been released by Australian Pump Industries, the big gusher QP602 is ideal for high volume transfer or large de-watering applications. |
|
At 150,000 litres per hour flow the Aussie 6” pump is a real water mover
The ability to move large amounts of water is vital for mines, quarries and construction sites. The QP602 is capable of transferring up to 2,500lpm with a maximum vertical discharge of 32 metres.
The six inch pump offers users a huge open style, high grade cast iron impeller, capable of passing small solids in suspension, it has the ability to draft water from depths of up to 7.6 metres, making it ideal for pumping from dams, tailing ponds or any site that has been flooded.
“Its unique high flow design makes it very efficient and gives it the ability to move water fast and at minimal cost,” said Aussie Pumps’ Scott Coleman, “and it only needs a 10 HP Yanmar diesel engine to achieve its full capacity,” he said.
The big Aussie gusher is powered by an air cooled Yanmar diesel engine with electric start for easy and efficient operation, the QP602 has a heavy duty wrap around frame for protection, a centre mounted lifting eye and four handles to aid lifting.
“This Aussie 6 inch pump is a breakthrough in terms of quality, value and performance,” said Coleman. “The diesel engine has excellent fuel economy which means that more water is pumped per litre of fuel than petrol models,” he said.
The QP602 comes with an unbeatable 5 year pump end warranty and 2 year Yanmar engine warranty, with marine grade aluminium pump housing and a carbon ceramic mechanical seal this pump is designed to last.
For more information visit: www.aussiepumps.com.au or Aussie Pumps Distributors throughout Australia.
| Tweet |
Weekly Top Stories
- Construction business fined for underpaying teenager
- Ritchie Bros Auctioneers to acquire AssetNation
- Hillhead 2012 comes to a boil
- Airport Link programmed to open in late July
- VDM awarded $38 million in new contracts
- Proposed Fitzroy Terminal project progresses


